
Bundle machine built-in map
1. After the installation, check whether the machine is stable and find that there are unstable places for reinforcement.
2, do a slow rotation for 10 minutes before starting the machine. Check whether the components are firm after the shutdown, whether there are oil shortages in the lubrication parts, and solve any problems that are detected.
3. Prepare the bundle before making the bundle according to the specifications, number of strands and wire diameter of the copper strand. Ready to twist the stranded copper wire into the bobbin hole, introduce the bow ring reel through the twisted reel, and then twist the stranded wire through the traction wheel and the light bar cable through the lead-in wheel. With it. Adjust the required pitch.